Research on Performance of Full-Scale Biological Deodorization Equipment in Field

Ning QIANG,Zhi-chao Wu,Sui-hai MAI
DOI: https://doi.org/10.3321/j.issn:0253-374X.2005.05.015
2005-01-01
Abstract:For effectiv management and control of the odor fugitive from some of sewage treatment facility (e.g. lift station),a full-scale odor control system was developed and tested in field.The system is made up of odor source enclosure,gas collection,interconnection conduit,control unit,fan and the chimney.The control unit is composed of the primary scrubber,two stage biological filter and programmable logic controller(PLC) control unit.The result of the filed test showed that the removal efficiency of H2S is higher than 99% under assumed gas volume loading (140 m3 ·m -2 ·h -1 ) while the removal efficiency can research 95% under gas volume loading of 240 m3 ·m -2 ·h -1 .There was no significant change in the pressure drop of the biotricling filter while the pressure drop of the traditional nature material filter is increased after 4 month's operation.The system showed good buffer capacity for the shocking loading.The removal efficiency can be kept more than 90% when the temperature is not lower than 10 ℃.
What problem does this paper attempt to address?