Operation Simulation of FLNG Offloading System

Jianxing Yu,Yan Li,Weilin Ma,Yuan Liu,Qiuya Lin
DOI: https://doi.org/10.11784/tdxbz201212031
2014-01-01
Abstract:The offloading system of floating LNG(FLNG)production storage and offloading is an important part of offshore LNG production chains. Because of the particularity of operating environment and conveying material,the traditional way cannot meet the requirements of transporting of liquid and offloading on dock. For studying the influ-ence of the changes in fluid temperature on the state of LNG flow within the pipe network,the calculation flow of the risk characteristic parameters of FLNG offloading system is determined and programmed with correlative formula and data. The liquid pump flow of the tanks,the pressures and temperatures of each node in the network(single time node)are obtained. Then this instantaneous-condition calculation method is extended to the whole process of loading and unloading,and the calendar relationship of the flow characteristic parameters during the LNG transit is con-firmed. The results of the model are in accordance with those of the real processes of loading and unloading,which shows that this computing method is feasible and accurate in the research of the risk characteristic parameters of FLNG offloading system.
What problem does this paper attempt to address?