Process simulation of LNG receiving terminal

Peng-fei SONG,Jian-guo HOU,Feng CHEN
DOI: https://doi.org/10.3969/j.issn.1001-9219.2014.04.016
2014-01-01
Abstract:One of the most essential parts in the design stage of LNG terminal project was using software to simulate the process. HYSYS software was used to build a model to simulate a LNG receiving terminal, and the key factors influencing the simulation results were analyzed. Based on the results, it was believed that the station would have the largest amount of BOG when no gas or liquid product was exported and LNG was unloading, and during loading the export load was highest when the amount of gas output was largest. Using recondenser to recycle BOG and medium or high-pressure BOG compressor to output gas directly could reduce BOG venting when gas or liquid product output was small.
What problem does this paper attempt to address?