Scheduling Multiple Orders Per Job with Various Constraints

ZHOU Bing-hai,WANG Teng,FANG Teng
DOI: https://doi.org/10.3969/j.issn.1005-3026.2015.10.030
2015-01-01
Abstract:Taking a comprehensive consideration of the characteristics of multiple product types, the past-sequence-dependent (p-s-d ) setup time and the deterioration effects constraints in processes of wafer fabrication,with an objective function of minimizing total weighted earliness-tardiness penalties cost,a mathematical programming model of scheduling multiple orders per job (MOJ) in a single machine was built.On this basis,the decision-making variables were separated,and a modified genetic algorithm-ant colony optimization (MGA-ACO )algorithm adopting two-level encoding mechanism was put forward.Genetic algorithm was converged to the process of dynamic and adaptive ant colony iterations.To improve the algorithm convergence performance,a modified rule of apparent tardiness cost with setups (ATCS ) was applied. Finally,the simulation results indicated that the developed algorithm is valid and feasible.
What problem does this paper attempt to address?