Joint scheduling of parallel machines and AGVs with sequence-dependent setup times in a matrix workshop

Ming-Peng Miao,Hong-Yan Sang,Yu-Ting Wang,Biao Zhang,Meng-Xi Tian
DOI: https://doi.org/10.1016/j.cie.2023.109621
IF: 7.18
2023-09-20
Computers & Industrial Engineering
Abstract:Transportation systems are often ignored in traditional parallel-machine scheduling problems (PMSP). This study addresses the problem of joint scheduling of parallel machines and AGVs (PMSP-AGV) with sequence-dependent setup times in a matrix manufacturing workshop. The goal is to minimize the makespan from the departure of AGVs to completion of the last job. To achieve this goal, a mixed-integer linear programming model (MILP) is established. An efficient discrete artificial bee colony (DABC) algorithm was proposed with improvement strategies, including a two-stage heuristic for initializing the population, six effective neighborhood operators to explore neighborhood solutions, new algorithm control parameters for deep local exploitation, and a multiple-insertion (MI) method used for re-initialization in the scout bee phase. Many instances from a real factory were used as test benchmarks. Comprehensive analysis of the experimental results showed that the proposed DABC algorithm was significantly superior to the four metaheuristics in the literature.
computer science, interdisciplinary applications,engineering, industrial
What problem does this paper attempt to address?