Solving multi-objective Flexible Job Shop Scheduling with transportation constraints using a micro artificial bee colony algorithm

H. Teng,Zhuang-Cheng Liu,Shuai Ma,Yanjun Shi
DOI: https://doi.org/10.1109/CSCWD.2013.6581001
2013-06-27
Abstract:We deal with multi-objective Flexible Job Shop Scheduling Problem (FJSSP) with transportation resources constraints herein, where the cost time of loaded and empty Automatic Guided Vehicle (AGV) cannot be neglected. This problem is a NP-hard problem, whose optimization objectives are to minimize the makespan and total workload of machines. We proposed a multi-objective micro artificial bee colony algorithm (MMABC) to tackle this problem. In MMABC, each solution corresponds to a food source, which is encoded to reflect the assignment of AGV tasks, machine operations, and operation sequence; the smaller bee population is divided in two parts: a replaceable bee part and non-replaceable bee part. We also employed the crossover operator to the employed bee for exchanging the good scheduling. Experimental results on larger examples and comparisons with multi-objective micro genetic algorithm showed the effectiveness of the proposed algorithm.
Computer Science,Engineering
What problem does this paper attempt to address?