A modified column generation heuristic for hybrid flow shop multiple orders per job scheduling problem

Bing Hai Zhou,Wen Long Liu,Bing-Hai Zhou,Wen-Long Liu
DOI: https://doi.org/10.1504/IJMTM.2019.100166
2019-10-07
International Journal of Manufacturing Technology and Management
Abstract:by Bing-Hai Zhou; Wen-Long Liu International Journal of Manufacturing Technology and Management (IJMTM) , Vol. 33, No. 1/2, 2019 With a comprehensive consideration of multiple product types, sequence-dependent setup time constraints and two different processing modes in wafer fabrication process, a scheduling model of multiple orders per job in a hybrid flow shop with an objective function of minimising total completion time of the system is developed. On the basis of the description, a new column generation algorithm based on a three-level (job-product-machine) disjunctive network flow is put forward. Furthermore, in order to improve degradation effects of the algorithm, a Lagrangian relaxation with sub-gradient optimisation is integrated into a frame of the column generation algorithm. Therefore, a modified column generation algorithm as a combination of Lagrangian approach and column generation algorithm is proposed. Finally, theory analysis and simulation experiments demonstrate that the presented algorithm is valid and feasible. Online publication date: Tue, 11-Jun-2019
What problem does this paper attempt to address?