Current Progress of Chinese HCCB TBM Program
Kaiming Feng,Xiaoyu Wang,Yongjin Feng,Yanjing Chen,Zhou Zhao,Zaixin Li,Pinghua Wang,Qijie Wang,Xingfu Ye,Fengchao Zhao,Long Zhang,Feng Wang,Qixiang Chao,Xinghua Wu,Yanlin Wang,Jun Wang,Yang Liu,Li Yang,Yinfen Chen,Guo Yu,Jie Liu,Xiaoyong Wang,Mingchun Zhang,Baoping Gong,Guoshu Zhang,Gang Hu,Bin Zhou,Hongbin Liao,Meng Bai,Chuanhong Pan,Xuru Duan,Chao Xing
DOI: https://doi.org/10.1016/j.fusengdes.2016.02.010
IF: 1.905
2016-01-01
Fusion Engineering and Design
Abstract:ITER is an unique opportunity to test tritium breeding blanket mock-ups in integrated Tokamak operating conditions. Helium-cooled ceramic breeder (HCCB) test blanket module will be the primary option of the Chinese ITER TBM program. China plans to test its own test blanket modules (TBM) during ITER different operation phase (H-H,D-D, D-T). A preliminary design of HCCB TBM have been completed in 2013. In order to reduce the effects of magnetic field ripple, the HCCB TBM design has been updated with reduced RAFM mass recently. Related R&D on key components fabrication, welding technology, materials development and mock-up test of TBM modules and components have being implemented. In this paper, the current status on design and related R&D, as well as the development of auxiliary system (TES, CPS,HCS, etc.,) of Chinese HCCB TBS program were introduced. (C) 2016 Elsevier B.V. All rights reserved.