Commissioning and Operation of Demonstration Project of Sludge Thickening Treatment with Flat-Sheet Membrane Process for Reuse of Reclaimed Water

Xuefeng Zhu,Mingyuan Zhou,Zhichao Wu,Wenyi Yuan,Jie Guan
DOI: https://doi.org/10.3969/j.issn.1009-0177.2015.04.019
2015-01-01
Abstract:The flat-sheet membrane process for reuse of reclaimed water operated smoothly in 28 days when capacity of sludge treatment was 190 m3/d.It was also detected that the average effluent sludge concentration maintained more than 35 g/L when the change of influent sludge concentration was 7~17 g/L.Trans-membrane pressure ( TMP) of reactors 2#, 3#and 4#kept below 20 kPa. TMP of reactor 1# increased fast due to its high flux.Finally, CODCr of the effluent was below 50 mg/L during 28 days'operation.