Design and Operation of MBR Process of Water Reclamation Project

YU Kai-chang,HUANG Xia
2008-01-01
Abstract:The water reclamation plant project of Miyun County Sewage Treatment Plant,with design capacity of 45 000 m3/d,employs MBR treatment process,world advanced hollow fiber membrane components and modularization design and installation,and realizes automatic control on the cleaning and maintenance of membrane components and the operation of the whole system.This project is the first large-size membrane-bioreactor sewage reclamation project of self design,self construction and self operation in China.The operation shows that with the gas-liquid turbulent flow purge and the on-line CIP chemical cleaning of membrane system once a week,the membrane contamination can be controlled at a comparatively stable level,with the average TMP value of 18.2 kPa and average instantaneous membrane throughput of 32.3 L/m2/h corresponding to net throughput 28.3 L/m2/h,and the MBR system can realize long-term stable operation.
What problem does this paper attempt to address?