Fuzzy random project scheduling problem

Hua Ke,Baoding Liu
2005-01-01
Abstract:Project scheduling problem is to determine the schedule of allocating resources so as to balance the total cost and the completion time, which has been studied widely and has been applied into real project problems. This paper considers project scheduling problem with fuzzy random activity duration times. Based on different ranking criteria of fuzzy random variables, three types of fuzzy random models as expected cost minimization model, (alpha,beta)-cost minimization model and chance maximization model are built. Finally, some numerical experiments are given to illustrate the effectiveness of the algorithm.
What problem does this paper attempt to address?