Genetic Algorithm for the Project Scheduling Problem with Fuzzy Time Parameters

Yilun Huang,Yongyi Shou,Linda Zhang
DOI: https://doi.org/10.1109/ieem.2011.6118005
2011-01-01
Abstract:It is essential to allocate scarce resource and schedule the activities effectively so as to improve the project performance. Due to inherent uncertainties of the environment and activities, a mathematical model with fuzzy time parameters is adopted for the resource-constrained project scheduling problem. A genetic algorithm based on a fuzzy parallel schedule generation scheme is proposed. Two schemes of fuzzification are adopted for activity durations. Computational tests show that triangular fuzzy time parameters would be preferred.