An Intelligent Optimazition Algorithm for Construction Project Scheduling Problem

LIU Tao,LIU Min,ZHANG Long,LU Shen,ZHANG Ya-bin
DOI: https://doi.org/10.3969/j.issn.1671-7848.2005.02.003
2005-01-01
Abstract:The construction project scheduling problem is discussed. And an intelligent optimazition algorithm combining the rules-based heuristic scheduling algorithms with genetic algorithm is proposed. The description on complex construction project scheduling, the decomposition of resource constrained construction project scheduling problem, the coding, generating of initial population, crossover and mutation of genetic algorithm are studied. Numerical computation results of different scale problems show that the algorithm has excellent performance for complex construction project scheduling problem and is suitable for construction project scheduling problem with complex resource and precedence constraints and serious resource conflicts.