Application of Gas-steam Combined Cycle Turbine After Power Grid Fault Recovery

DONG Chao,ZENG Kaiwen,CHEN Gang,HU Shizhao,CHEN Qixin
DOI: https://doi.org/10.3969/j.issn.1007-290X.2016.11.016
2017-01-01
Abstract:Power flow characteristics of Guangdong power grid are complex and overhaul for major power outages is inten-sive,which may cause grid structure weak and system running risks increase. In order to improve fast recovery ability of the power grid after failure,this paper analyzes characteristics of single shaft gas-steam combined cycle turbine and double shaft gas-steam combined cycle turbine of Guangdong power grid,and obtains experiences of normal operation,peak load and black start. Based on modeling according to fast cut back (FCB)technology principle and operational characteristics of gas-steam combined cycle turbine,it proposes an optimized model considering load climbing rate and fast recovery time. On the basis of example data,it proves validity and practicability of this model in realizing fast recovery of the power grid after fail-ure.
What problem does this paper attempt to address?