Study on Quick Start-up of Steam Turbine in a Gas-Steam Combined Cycle

郑李鹏,陈坚红,盛德仁,洪雷,顾正浩,林成
2011-01-01
Abstract:It generally takes a long time to start up a gas-steam combined cycle unit in warm mode after one night's shutdown following its peak load regulation.In order to solve this problem,a 2D axisymmetric finite element model was built based on some reasonable assumptions and simplifications,with which the steam temperature,pressure and heat transfer coefficient of different parts were calculated,and hence the thermal stress was obtained for rotors at different start-up modes using thermal-structure sequential coupling method.Results show that if the allowable metal temperature of governing stage rotor is set as 350 ℃ for hot start-up mode,the maximum thermal stress of start-up curve of steam turbine rotor will still be less than the strength limit of materials after starting up with optimized mode,under which conditions the life management of power plant can be satisfied,and 100 min is to be saved at every start-up,resulting in increased economical effects.
What problem does this paper attempt to address?