Problems and solutions of shield tunneling for Beijing metro

Zhang Xinjin,Liu Weining,Lu Meili,Luo Furong,Zhang Chengman
DOI: https://doi.org/10.3321/j.issn:1000-131x.2008.10.014
2008-01-01
Abstract:Based on a detailed investigation and analysis,the present situation of shield tunneling for Beijing metro construction was studied.The main problems of shield method in the planning of the projects were as follows.First,continuous tunnel sections constructed using shield method were only a few;second,the efficiency of shield machine was low;third,the time used for non-excavation tasks in shield tunneling was too long;fourth,the targeted project time using shield tunneling could not be guaranteed;and finally,the additional cost of shield tunneling was high.Detailed analysis indicates that the major cause for the problems was the contradiction of construction time between shield tunnel sections and adjoining stations,with the additional cause being that construction organization of shield tunneling was not well planned.A solution for the problems was put forwarded:let the shield machine pass a series of stations in the line first,and then construct the stations by cut-and-cover method or mining method at proper times.Such scheme may be of great advantages in improving construction quality,speed and cost reduction.
What problem does this paper attempt to address?