The optimization simulation model based on the project's three-dimensional target preferences

Biao ZENG,Xin LIU
DOI: https://doi.org/10.3969/j.issn.1003-4271.2014.03.27
2014-01-01
Abstract:The paper extends the traditional one-dimensional project schedule optimization to a preference of 2D target(schedule, cost) optimization, and then to a three-dimensional target optimization. First this article shows the theory of dynamic optimizing project schedule in detail and points out the limitations of existing methods. At the same time, it expounds the intelligent and mineralization type method, the basic principle and application of genetic algorithm, and how to use Matlab genetic algorithm of intelligent optimization function. This paper constructs the multidimensional model of optimizing management of project schedule. At last, the model solves the project schedule management problem respectively: no resource constraints project schedule optimization, the resource constraints project schedule optimization and multi-objective optimization(resource, cost, efficiency). Meanwhile, in order to verify the validity of the genetic algorithm to solve above problems, this paper applies universality case for validation. The results show that the genetic algorithm can solve such problem better compared with other traditional methods.
What problem does this paper attempt to address?