Multi-objective Optimization of Engineering Project Based on Petri Nets

Hua WANG,Hong-fu SUN
DOI: https://doi.org/10.13991/j.cnki.jem.2015.01.026
2015-01-01
Abstract:In order to manage the project effectively,the integrate control of the schedule,quality and cost is very necessary in the process of engineering project construction. But it is difficult to achieve these goals at the same time. From the view of system,we create a correlation function among schedule,quality and cost. Then collaborative management thinking and timed Petri Net are used to build a model concentrate on multi-objective optimization of engineering project to realize the goal of multi-objective optimization. At last,particle swarm optimization is adopted in the optimization to solve the model. The analysis shows the model we built is feasible and effective,and it can also provide decision support for the construction of the engineering project.
What problem does this paper attempt to address?