Analysis of Converter Transformer Protection Reformation and Research of Testing Technology

ZHANG Jia-min,JIANG Chen,LI Peng,YUAN Yu-bo,ZHANG Jian
DOI: https://doi.org/10.19464/j.cnki.cn32-1541/tm.2013.02.008
2013-01-01
Abstract:As the high voltage level and huge transmission capacity,the influence of DC block caused by incorrect action of protection equipment is great.The existing electric protection and non-electric protection of converter transformer has only one contact,in order to improve the stability of HVDC(high-voltage direct current),the protection of converter transformer should be reformed.Different with the AC transformer reformation,the converter transformer protection is integrated in the PPC(pole protection control) system;the reformation of converter transformer protection includes the modification of the DC control and protection program and external wiring.Based on the reformation of converter transformer protection of Zhengping converter station,this paper analyzed the debugging method of protection equipment and the modification method of the program,and gives the scheme for converter protection testing.
What problem does this paper attempt to address?