The problem of two-stage hybrid flowshop research

牛海军,孙树栋
DOI: https://doi.org/10.3969/j.issn.1001-2400.2002.03.005
2002-01-01
Abstract:In this paper, we consider the two-stage hybrid flowshop with a single machine at stage 1 and two identical multiple parallel machines at stage 2. To find a minimum makespan schedule, which is NP-complete, three heuristic algorithms based on the branch-and-bound algorithm and Johnson's rule have been proposed in the literature. A lower bound based on solving an artificial hybrid flowshop problem is derived. Furthermore, the computational experiments are conducted to evaluate and compare the effectiveness of these algorithms.