Two-stage flexible flowshop scheduling with limited machine availability

Xijun Wang,Jinxing Xie
DOI: https://doi.org/10.3321/j.issn:0254-3079.2003.02.021
2002-01-01
Abstract:Machines may not be available all the time due to uncertain breakdown or preventive maintenance activities. As a result of its reality and importance, more and more literatures about this constraint has been published during the last few years. We study the two-stage flexible flowshop-with limited machine availability under the assumption that the unavailable time intervals called holes are known in advance. The objective function considered is makespan. We discuss the complexity of this model and prove that, the problem is A(P-hard in the strong sense even if there is only one machine at one stage and only one hole on that machine. We also explore the approximability of this model and point out the APX-hardness of the problems with holes on the whole second stage or on the whole first stage but having more than one machine at it. Then we provide two algorithms with finite tight worst case performance bound for the case where there is only one machine at the first stage and only one hole on that machine.
What problem does this paper attempt to address?