Two-stage Flow Shop with a Batch Processor and Limited Buffer.

Cheng Zhang,Zhongshun Shi,Zewen Huang,Yifan Wu,Leyuan Shi
DOI: https://doi.org/10.1109/coase.2016.7743432
IF: 9.018
2016-01-01
International Journal of Production Research
Abstract:This paper addresses a two-stage flow shop scheduling problem with a batch processor followed by a discrete processor. Jobs are grouped in incompatible job families, and the buffer between the two machines is limited. The batch processor will be blocked until there is a free unit in the buffer. The objective is to determine a schedule such that the total completion time is minimized. We propose a mixed integer linear programming model and two lower bounds for this problem. A hybrid algorithm together with the worst-case analyses is also developed. Numerical results demonstrate that the proposed algorithm has a competitive performance on the large-scale problems.
What problem does this paper attempt to address?