Formulation and Methods for a Class of Two-stage Flow-shop Scheduling Problem with the Batch Processor.

Runsen Wang,Yilan Shen,Weihao Wang,Leyuan Shi
DOI: https://doi.org/10.1109/case48305.2020.9216748
2020-01-01
Abstract:Motivated by the heat-treating process in a launch vehicles manufacturing plant, we study a two-stage scheduling problem with limited waiting time where the first stage is a batch processor and the second stage is a discrete machine. A mixed-integer programming model is developed and two lower bounds are derived to measure the performance of proposed algorithms. An efficient heuristic together with worst-case analysis is also proposed. Genetic Programming approaches are applied to the flow-shop scheduling problem. Numerical results demonstrate that the proposed algorithms perform better than other meta-heuristics in different production scenarios.
What problem does this paper attempt to address?