Treatment Technology of Gas for Long - Large Railway Tunnel in Construction

刘新华,张帆,陈秋南,李晓峰,吴多云
DOI: https://doi.org/10.3969/j.issn.1674-5876.2011.03.009
2011-01-01
Abstract:Changle tunnel has length of 6 300 m and section area of 56 m2 for Luoyang -Zhanjiang railway, the tunnel rock stratum consists of brittle metamorphosed quartz sandstone and slate primarily, and the bedding joints in quartz sandstone are well developed. Gas outburst is found in construction section during construction, and it is very hazard to the construction safety. The gas outbutst characteristics is analyzed after gas is detected and forecasted, according to the actual engineering situation, some useful measures of tunnel gas are proposed, and the gas treatment results show that the proposed measures are effective and successful.