Study on the calculation of time-varying system of pipe network of hydropower station

Chen Naixiang
DOI: https://doi.org/10.3969/j.issn.0559-9342.2003.07.012
2003-01-01
Abstract:Due to the mal-operation and failure in the o peration of the auxiliary system of hydropower station, its pipe network will occur isolating node and isolating sub-network,which will make the calculation difficult. This paper proposes one of head activating method that can activate isolating node and isolating sub-network. This is to make the isolating node and some nodes of the isolating sub-network under the given head limit to be solved. In allusion to the calculation difficulty of the changed structure because of the mal-operation and failure in the operation of the auxiliary system of hydropower station, the simulation calculation of hydropower station's auxiliary system on VCS3, it got satisfied results, and realized the interplay of graphical interfaces and calculation model.