Design for wastewater treatment engineering in Zhenyi electron factory,Shenzhen

熊正为,刘金香,左洪泽
DOI: https://doi.org/10.3969/j.issn.1005-829X.2002.04.020
2002-01-01
Abstract:The capacity of the industrial effluent from Zhenyi Electron Factory in Shenzhen is 154 cubic meters per day. The organic wastewater containing epoxy resin,butanolamine,colourant and filler has low concentration, and it is not highly biodegradable. For this wastewater,the supernatant liquid from settling tank is treated by SBR process after coagulation and sediment. The running results show that the output water quality meets first National Discharge Standard(GB8978—1996).