Receiver and Transmitter Synchronization for Crosswell Electromagnetic Imaging Logging Tool

ZHOU Kaibo,MO Deqian,CHEN Huan,LIU Jie,CAO Panhui
DOI: https://doi.org/10.3969/j.issn.1004-1338.2014.05.019
2014-01-01
Abstract:From crosswell electromagnetic imaging logging tool(CEMIT),the phase difference between receiving and transmitting electromagnetic wave signal is closely related to formation conductivity.The higher synchronization precision of receiver and transmitter,the smaller measurement error of the phase difference,therefore we can more accurately calculate formation conductivity and remaining oil reservoira.Based on GPS a synchronization method is presented for CEMIT in the paper.First of all,four real-time clock modules are implemented in two Surface Model System(SMS)and two Downhole Tool Model System(DHTMS).Based on the reference time from GPS receiver,the clocks in SMSs are calibrated.And then after transmission delay between SMS and DHTMS has been measured and two clocks in DHTMSs are calibrated by corresponding SMS's clock with the transmission delay.Lastly,the synchronization between receiver and transmitter is achieved.Experimental results show that synchronization clock error is less than 400 ns between receiver clock and transmitter clock when communication protocol between SMS and DHTMS uses RS-485,which corresponds to a phase accuracy of 0.144 degree at 1kHz.
What problem does this paper attempt to address?