DEBUGGING OF A 1025t/h W-SHAPED FLAME BOILER IN SHAOGUAN POWER PLANT

马斌,徐齐胜,李乃钊,岑可法
DOI: https://doi.org/10.3969/j.issn.1002-3364.2004.05.008
2004-01-01
Abstract:The design features, coal properties, main systems, as well as trial operation and combustion adjustment of a 1025t/h Wshaped flame boiler in Shaoguan PowerPlant have been presented, the problems existin gin boiler design and in operation being discussed. The achiements and experiences obtained in trial operation of said unit have significance for reference in developing and perfecting the Wshaped flame boilers.