Cold test of s-band re-entrant cavity BPM for HLS

Qing Luo,B. G. Sun,Jia Fang,D. H. He
2010-01-01
Abstract:An s-band re-entrant cavity BPM system is designed for new high brightness injector at HLS. A prototype cavity BPM system was manufactured for off-line test, which is also called cold test. According to the results of computer simulation, wire scanning off-line test method can be used to calibrate the BPM and estimate the performance of the on-line BPM system. Cross-talk problem was detected during the cold test. Ignoring nonlinear effect, transformation matrix is a way to correct cross-talk. Analysis of cold test results showed that position resolution of prototype BPM is better than 3 μm.
What problem does this paper attempt to address?