Temperature-rise of transformer and heat transfer process for embedding system

Min Hu,JIANG Yi-min,XIAO Deng-ming
DOI: https://doi.org/10.13336/j.1003-6520.hve.2009.06.038
2009-01-01
Abstract:Since underground and embedding transformers are set in pit for long time, heat problem is very prominent. The temperature-rise of power transformer and environmental temperature of pit play a vital role in its safe operation, so the experimental study of DGSR11-H-315/10 transformer was conducted with thermoelectric couple. Moreover, the embedding system (including embedding transformer, pit flow and soil medium) heat transfer model was established, and numerical simulation was conducted to study temperature distribution. Comparison of computed and test results indicate the feasibility of above model, which provides a theoretic basis for extending and developing the application of embedding transformer.
What problem does this paper attempt to address?