Evaluation and incentive mechanism of peaking capability of hydroelectric/thermoelectric generators

谢俊,白兴忠,甘德强
DOI: https://doi.org/10.3785/j.issn.1008-973X.2009.11.025
2009-01-01
Abstract:Six essential factors affecting the peaking capability of hydroelectric/thermoelectric generators were analyzed, including maximum output, minimum output, minimum up/down time, ramp up/down limits, ramp domain, and water discharge of hydro units for peaking. Incorporating the six essential factors, a fuzzy synthetic evaluation method for the peaking capability of generators was presented. The incentive mechanism for improving the peaking capability of generators considers the peaking task of the system, the peaking capability of each generator, and the purchased electricity quantity of each generator. The simulation with the original data of Northwest China Power Grid (NCPG) showed that the evaluation method can accurately reflect the six factors which affecting the peaking capability of generators, and the proposed incentive mechanism can incent the generators to provide the peaking service and improve the peaking capabilities effectively.
What problem does this paper attempt to address?