Review of Long-Term Settling of High Fills

XU Ming,SONG Erxiang
DOI: https://doi.org/10.3321/j.issn:1000-0054.2009.06.002
2009-01-01
Abstract:The booming infrastructure development in western China is leading to more and more high filled construction.The long-term settling of these high fills will influence the highways,railways and airports built on top fills,but this settling is difficult to predict.This paper investigated a wide range of long-term field monitoring of high fills.The results show that creep settling,which will continue over a long period,is linearly related to the logarithm of the elapsed time.Large collapse settling can occur during wetting after construction.Laboratory testing showed that the settling is related to the micro-mechanisms of the coarse soils.So,it is necessary to carry out long-term monitoring on high fills in China and micro-mechanisms research.
What problem does this paper attempt to address?