Construction of A Full-Length Prototype of the Besiii Drift Chamber and On-Detector Test for the Besiii Drift Chamber Electronics

Qin Zhong-Hua,Yan Zhi-Kang,Chen Yuan-Bo,Wu Ling-Hui,Liu Jian-Bei,Chen Chang,Xu Mei-Hang,Wang Lan,Ma Xiao-Yan,Jin Yan,Liu Rong-Guang,Tang Xiao,Zhang Gui-Fang,Zhu Qi-Ming,Sheng Hua-Yi,Zhu Ke-Jun
DOI: https://doi.org/10.3321/j.issn:0254-3052.2007.04.010
2007-01-01
Abstract:A full-length prototype of the BESIII. drift chamber was built. The experience gained on gas sealing, high voltage supply and front-end electronics installation should be greatly beneficial to the successful construction of the BESIII drift chamber. An on-detector test of the BESIII drift chamber electronics was carried out with the constructed prototype chamber. The noise performance, drift time and charge measurements, and electronics gains were examined specifically. The final test results indicate that the electronics have a good performance and can satisfy their design requirements.
What problem does this paper attempt to address?