Identification method of integration point based on time cost

Dong-jiao JIA,Ren-zhong TANG
DOI: https://doi.org/10.3969/j.issn.1006-5911.2007.01.030
2007-01-01
Abstract:To identify integration point and define its priority, the integration points were classified into activity integration point, process integration point and data integration point. Then an identification method of integration points based on time cost was presented to identify the activity integration point and process integration point. In this method, the Activity-Based Costing (ABC) was applied, then the data source number and data amount were defined as the time cost driver, which were used to allocate and calculate the time cost of activity, and the time cost of activity information preparing was defined as the index to identify the integration point and determine its priority. To intuitively represent the time cost of activity, the time value chain model was applied to construct the time cost model of activity. The presented method could identify the integration point and its priority quantitatively, and was proved to be effective.
What problem does this paper attempt to address?