Monitoring and analysis of excavation in circulation water pump-station of Beilun Power Plant

ZHOU Xiang-lian,WANG Jian-hua
DOI: https://doi.org/10.3321/j.issn:1000-4548.2006.z1.112
2006-01-01
Abstract:The excavation in circulation water pump-station of Beilun Power Plant,by use of top-down construction method,was proposed.The deformation of diaphragm walls,steel stresses,soil pressures and settlements were monitored,and the monitoring data during the construction were analyzed.The analysis of the monitoring results show that the deformation of excavation is controlled within the allowable range and the construction of excavation has small effect on surroundring environment.Finally,the project by use of top-down excavation is successful and the expected engineering effect is acquired.