Implementation and Development of AI Back Analysis for the Underground Powerhouse of Jinping-1 Hydropower Project

周钟,刘中港,廖成刚,程丽娟,尹宏磊,郭凯,徐千军,张志增,李仲奎
2010-01-01
Abstract:Jinping-1 hydropower station is a key underground hydroelectric power project in the southwest of China.The powerhouse of this project is very large and under complicated poor geological conditions with a maximum crust stress of 35MPa,which brought many difficulties and a great challenge to the design and construction and high uncertainties of the caverns safety.A back-analysis of the powerhouse construction process is quite necessary.In this paper,the layout,principle,structure and implementation of the back-analysis system is briefly described,and some new developments are demonstrated in details,such as the zonal modeling of crust stress field,the convergence-increment hybrid target function and variable loosening zonal model.Finally this paper shows how this system works out an optimum and adjusts the excavation and cavern supports,and the roles of back analysis in making prediction and warning to ensure the power house safety.
What problem does this paper attempt to address?