Study on Scheme Applying High Temperature Air Combustion Technology to Rebuild a Cell Pit Furnace

朱彤,苏正川,饶文涛
DOI: https://doi.org/10.3321/j.issn:0253-374x.2004.08.012
2004-01-01
Abstract:Numerical simulations about applying high temperature air combustion technology to rebuild a cell pit furnace were carried out.The results show that it would make the new combustion system,flue gas flow in furnace,heat transfer to coordinate with the furnace configuration and heating work piece technology.If the input heat quantity in several rebuilding schemes is equal to the original input heat quantity,the highest flame temperature in furnace is relatively low when the air is preheated at 1 273 K and the gas at 1 073 K,while the average flame temperature is relatively high.The uneven coefficient of temperature distribution R tu decreases from 33.18 to about 18.00.In addition,if the preheated air temperatures are equal to each other,the higher the preheated gas temperature is,the more NO x emission is.Therefore,the rebuilding scheme is put forward in this paper.At last numerical simulations of unsteady combustion process were carried out.
What problem does this paper attempt to address?