Simulation experiment study on LOCA at upper plenum of nuclear heating reactor

Jinhai Bo,YouJie Zhang,Shaorong Wu,Bing Han,Xuedong He,Xuesong Zhang
1996-01-01
Abstract:Simulation experiment of small break of upper plenum join pipe was described. In the experiment, the system working parameters on condition that there was rest power after the reactor being shut down were studied at the heating reactor thermohydraulic test system HRTL-5. The design principles of which were satisfied for the main simulation criteria of single and multiphase flow. According to the analogue condition that the cross section of break was proportional to the evaporation area and the practical demands, four different diameters of breaks, 0.6, 3.7, 5.0 and 10.0mm, were adopted in experiment. The effect on the nuclear heating reactor safety under break conditions is given.
What problem does this paper attempt to address?