Upgrading of 10 Kv Distribution Transformer and Prefabricated Substation to 20 Kv Voltage Level

HU Xiande,WU Huanhong,ZHANG Hong,ZHOU Hao,GE Zhenquan,SUN Ke,ZHANG Quanming,PAN Hong,FANG Ganlin,FENG Dongliang
2012-01-01
Abstract:The technical feasibility of voltage upgrading is analyzed by calculating the parameters of core,high-voltage winding and low-voltage winding for various types of 10 kV distribution transformer,and the economic effect is compared among different upgrading schemes for selecting the optimal one.Results show that,10 kV dry-type transformer can be technically upgraded to 20 kV level by capacity reduction but the cost is higher than new 20 kV dry-type transformer with same capacity,so it should be replaced by 20 kV one;about 90 % of 10 kV oil-filled transformers can be easily upgraded to 20 kV level without capacity reduction by high-voltage winding replacement and the cost is about 35 % 45 % of new 20 kV oil-filled transformer with same capacity;it is possible to upgrade European prefabricated substation from 10 kV to 20 kV;American prefabricated substation should be replaced by 20 kV one.
What problem does this paper attempt to address?