Design and Construction of Big-span and Super Shallow Tunnel in the Great Wall Mountain

WANG Gang,LIU Jun
DOI: https://doi.org/10.3969/j.issn.1671-119x.2010.04.023
2010-01-01
Abstract:By means of scientific and strict design,rational control in construction,combingat on of dynamic design and construction,and accurate advanced forecast of geology and monitoring data,the special project of big-span,super shallow tunnel can be completed smoothly.According to the technical summary of project design and construction in the Great Wall tunnel,design parameters,control technology and integrated situation among design and construction are introduced which provides referential experience for the project big-span and super shallow tunnel.
What problem does this paper attempt to address?