Research on construction method and deformation control technology of high ground stress interbedded soft rock tunnel

Zhichun Fang,Zhengguo Zhu,Xinyu Chen
DOI: https://doi.org/10.3233/jifs-189455
2021-04-12
Abstract:The construction of tunnels is often long and deep buried tunnels, and the geological conditions are more complex. Based on Jianshan tunnel in Gansu Province, the special geological conditions such as high ground stress and weak interbedded surrounding rock make the excavation of tunnel easy to produce large deformation. In this article, the software finite difference software FLAC3D was used to establish numerical models and select the best construction method by comparing the deformation of the tunnel under different construction methods. Aiming at the deformation characteristics of soft rock tunnels in highland interbedded layers, the control measures of tunnel deformation are discussed. Mainly consider the two aspects of the bolt support plan and the second lining construction time, comprehensively compare the deformation characteristics of the tunnel, and select the best working condition. The research results show that the combination of three-step temporary invert method and three-step ultra short bench method is recommended for the tunnel construction; when the bench length is 4 m, the deformation control effect of the tunnel is the best; by improving the length and angle of the anchor rod, the deformation of the tunnel can also be well controlled.
What problem does this paper attempt to address?