Study on Drainage Pipeline Project Quality Control

GUO Zhiyu
2009-01-01
Abstract:This paper describes the entire process of drainage pipes construction,including quality control steps of pipe procurement,measured discharge line,trench excavation,flat base tube socket,install pipes,interfaces,check the wells closed water test,backfill and so on.It also analyses some common quality problems in drainage pipeline construction,and puts forward appropriate quality control measures.
What problem does this paper attempt to address?