Earth-filled Construction and Quality Control in Zhengzhou Section of the Middle South-to-North Water Transfer Project

LI Dao-xi,WANG Yi-fei,CHENG Lin,YAN Li-ming,CHEN Bao-cheng
DOI: https://doi.org/10.3969/j.issn.1002-5634.2012.03.004
2012-01-01
Abstract:The South-to-North Water Transfer Canal is a large earth canal with large earth-filled engineering quantity and high earth-filled net-height.Therefore,earth-filled construction and quality control of canal embankment is particularly important.According to engineering quality management practices in Zhengzhou section of Middle South-to-North Water Transfer Project,quality control measures during earth-filled construction are summarized systematically,including material source control,adjustment about soil moisture,soil spreading method and thickness control,rolling method and number control,sample testing requirements,construction requirements in unconventional seasons and so on.This is expected to provide a reference for earth-filled construction in the South-to-North Water Transfer Project.
What problem does this paper attempt to address?