Technique for Utilization of High-Water-content Dredged Clayey Soil As Fill Material for the Eastern Route of South-to-North Water Diversion Project

邓东升,张铁军,张帅,洪振舜
DOI: https://doi.org/10.3876/j.issn.1000-1980.2008.04.028
2008-01-01
Abstract:A great quantity of waste dredged clayey soil is generated by the construction of the Eastern Route of South-to-North Water Diversion Project in China.Its proper disposal is therefore an important issue.A new method has been developed to dispose of the high-water-content dredged clayey soil by adding quick lime.The treated soil is expected to be useful as fill material in cofferdam and dike engineering.Laboratory tests have also been performed on the treated soil with the following results: the plasticity index of the treated soil decreases with the increase of quick lime content;when the quick lime content remains constant,the plasticity index of the treated soil with higher initial water content is larger than that of the treated soil with lower initial water content;the decrease in the plasticity index of the treated soil occurs mainly in the first three days of curing.
What problem does this paper attempt to address?