In-situ Test Study on Compaction Control Parameters for Particular Subdivisional Railway Earthworks

Jianbo Fei,Jinfeng Xiao,Yuxin Jie,Kaihang Han,Changsuo Yang
DOI: https://doi.org/10.1080/10298436.2019.1683177
2019-01-01
Abstract:Parameters as well as their corresponding reference values, adopted to control the compaction quality during the construction of High-speed Rail(HSR) embankments in different countries are summarised in this paper. Different measurement methods for the degree of compaction are analysed with the comparison of the features of various plate loading tests. To investigate the relationships between different compaction control parameters, we conducted in-situ compaction tests on three particular subdivisional railway earthworks at Zhangjiakou-Datong HSR and Inner Mongolia-Jiangxi Railway: a bridge foundation pit below the embankment-bridge transition section, a geogrid-reinforced cushion above embankment foundation, and an excavated channel for drainage ditch. We investigate the relations of the Dynamic Deformation Modulus (E-vd ) versus the Reaction Modulus (K-30 ), E-vd versus the compaction coefficient (K) by analysing the measured data. The analysis result shows good linear correlations between E-vd and K-30 , as well as E-vd and K. Based on the analysis performed in this paper combined with our engineering practices, recommended reference values of the compaction control indicators for bridge foundation pit below a transition section and the bottoms of drainage ditches are also proposed in this paper.
What problem does this paper attempt to address?