Unit Price Analysis of Excavation of Pilot Shaft for Deep Inclined Shaft in an Area with High Altitude and Field Stress

白现军,侍克斌,陈功民,刘章,周峰
DOI: https://doi.org/10.3724/sp.j.1201.2012.01142
2012-01-01
Abstract:The Bulunkou-Konggur hydropower station is located in an area with high altitude and terrestrial stress,and its inclined diversion shaft has one of the biggest inclination angles among all the shafts already constructed and under construction.Therefore,it has many unsafe factors during the construction period.In the construction of pilot shaft,the excavation method of full-section borehole blasting from bottom to top-bad rock displacement with gravity is used,which ensures the security,quality and progress of the construction.The unit price analysis can provide the detailed data to control the construction consumption for these types of projects scientifically and accurately.The results showed that this method has several advantages,such as low cost and simple equipments and technology,thus it has potential to be popularized.
What problem does this paper attempt to address?