Modeling Operation Condition of Reversed A~2/O Process with TUD Model

Wang Hong-chen
2007-01-01
Abstract:Combined with the practical operation of reversed A2/O process of a large municipal wastewater treatment plant in Beijing,the mathematical simulation of the plant working conditions was conducted using TUD model and the default parameters.The aim of the study is to demonstrate the effectiveness,accuracy and simplicity of global current models for simulating China's WWTPs and then to promote the application of simulative techniques in China.With default parameters,the predicted COD and TSS concentrations in the effluent are consistent with the measured data,and TP is also reasonable.However,N concentrations are not satisfactory.With minor adjustment of some N components and affinity constants of nitrifiers(iNSF=6%,iNXS=6%,KNH4=1.5 gN/m3),the predicted results for COD,N and P reach to a quite good level.With two sets of operational parameters at different seasons,the simulations give also good results approaching to measured data.
What problem does this paper attempt to address?