Operation Simulation and Improvement for Helium Leak-checking Unit

JIANG Zu-hua,ZHUO Ming-liang,SUN Yi-wei,XU Zhi-xiang
DOI: https://doi.org/10.3969/j.issn.1006-8309.2006.03.001
2006-01-01
Abstract:The working efficiency of leak-checking unit in the compressor assembly line is not high,and tiredness of operator is rather high,so the work study is needed to do for this unit.According to the principles of Ergonomics,some factors in working intensity had been analyses using the on-spot observation and analysis of video.Changing the height of the working table and adding some equipment,as well as simply manual operation,the working step is improved and working intensity is reduced.Some operation had been simulated using JACK software to analysis the improved effects.Some suggestion had been given for rebuild the assembly line.
What problem does this paper attempt to address?