Application Of Work Study To The Improvement Of Production Process: A Case Study (Id : 1-047)

Zhang Chi,Su Qin,Cao Peng
2006-01-01
Abstract:Aiming at the assembly process of wire bond of an enterprise, time study method was used to measure the task time of working procedures and then Arena was used to simulate the whole working process to evaluate it effectively. It was then found that its balance efficiency was very low. 5W1H check list, procedure analysis and operation analysis method were used to analyze further and it was then found that its job shop process, the unreasonable working procedures sequence and the great gap between the time taken by different working procedures were three main causes for the low balance efficiency. After that, problematic procedures were eliminated, combined, rearranged or simplified to make the procedures' content and their sequence more reasonable. All these improvements enable the working procedures much easier to be balanced. The last step to balance the assembly line was to reassign operators. All these improvements made the assembly line possess the advantages of flow-line production system and made the balance efficiency be increased by 30% at least according to the result of simulation by Arena. This verified the effectiveness of work study in the improvement of production process and assembly line balancing.
What problem does this paper attempt to address?