A Comparative Study of Unbalanced Production Lines Using Simulation Modeling: A Case Study for Solar Silicon Manufacturing

Chen-Yang Cheng,Shu-Fen Li,Chia-Leng Lee,Ranon Jientrakul,Chumpol Yuangyai
DOI: https://doi.org/10.3390/su14020697
IF: 3.9
2022-01-09
Sustainability
Abstract:In the solar silicon manufacturing industry, the production time for crystal growth is ten times longer than at other workstations. The pre-processing time at the ingot-cutting station causes work-in-process (WIP) accumulation and an excessively long cycle time. This study aimed to find the most effective production system for reducing WIP accumulation and shortening the cycle time. The proposed approach considered pull production systems, and the response surface methodology was adopted for performance optimization. A simulation-based optimization technique was used for determining the optimal pull production system. The comparison between the results of various simulated pull production systems and those of the existing solar silicon manufacturing system showed that a hybrid production system in which a kanban station was installed before the bottleneck station with a CONWIP system incorporated for the rest of the production line could reduce the WIP volume by 26% and shorten the cycle time by 16% under the same throughput conditions.
environmental sciences,environmental studies,green & sustainable science & technology
What problem does this paper attempt to address?